* Log In to use the Calculate function *
Become a Member!
Calculate the Unit Peak Discharge and the SCS Unit Hydrograph:
*Referencing the FHWA Highway Hydrology Manual, calculate the SCS unit hydrograph for a watershed.
Calculation:
Designer/Checker:
Input:
Metric Units
For Metric, all input units are converted for the calculation below then converted back for the output results.
Enter the time of concentration (tc - hr)
Drainage basin area (A - sq mi or sq km)
Enter the peaking constant (Kp)
??
Standard SCS: Kp = 484
Output:
Login
to enable the Formulas!
Not a Member?
Join Now!
Time to peak, tp =
Unit peak discharge, qp =
Start Using The Calculations >>> Become A Member Now!
CECALC.com LLC - Copyright 2010 - 2024 - All rights reserved.